Week 1
(1st December – 5th December 2014)
- Orientation carried out by Human Resource Executive, given an introduction about the company
- I was assigned to the IT department and introduced to the IT assistance officer and all the employees.
- Learned to clone a hard disk using a software called Casper 8.0.
- Moved the PC’s from the production floor to a new place.
- I was taught how to configure a PC for a user including all the software’s needed, network configuration, joining a domain and so on.
- Given briefing about how to do every day backup for two servers which is EPP 2003 and EPP 2008.
- Assigned to format a Windows 7 PC and configure it for user
Week 2
(8th December – 12th December 2014)
- Backup the servers and send it to EGM every morning to swap each other’s backup tape. This is to ensure the data is safe and secure.
- Configure PC for the user.
- Change the LAN Cable for thumbprint machine.
- Replace a new network card for a PC.
- Set up a network printer for a user.
- Share a printer on a network.
- Format Windows XP to Windows 7 and configure it for a user.
- Update windows in computers.
Week 3
(15th December – 20th December 2014)
- Backup the servers and send it to EGM every morning.
- Repair and fix corrupted word files by using a software called My Word.
- Download and install printer driver from Internet.
- Move outlook personal folders from old PC to new one.
- Configure new PC for a user.
- Troubleshoot Oracle Application by installing Jinitiator to the PC
- Troubleshoot Internet Explorer by updating to the latest version.
- Configure Internet Explorer to install Chinese language for the user.
Week 4
(22nd December – 26th December 2014)
- Backup the servers and send it to EGM every morning.
- Clone a PC’s hard drive.
- Troubleshoot Oracle Application, Install and open it via Firefox cause failed to open in Internet Explorer.
- Configure PC for the user.
- Set up network printer and USB printer.
- Restore Windows 7 to factory settings.
- Download and install Office 2003 in a computer.
- Troubleshoot printing failure from html and pdf documents by installing
- scriptx.meadroid add-on.
Week 5
(29th December 2014 – 2nd January 2015)
- Backup the servers and send it to EGM every morning.
- Upgrade RAM to the computer.
- Company shut down on 31st December 2014.
- New Year leave on 1st January 2015.
- Restore Windows 7 to factory settings.
- Set up a desktop for new employee.
- Install Finger-Tec (TCMS V2) software for HR’s new PC.
- Set up network printer for user.
FINAL REPORT 2014 - 2015