Week 6
(5th January – 9th January 2015)
- Download and install VMware Standalone Converter to virtualize a physical machine.
- Download and install VMware Workstation to play the virtual machine.
- Virtualize windows XP in windows 7 using VMware tools.
- Troubleshoot domain login problem by joining workgroup then rejoining the domain.
- Troubleshoot Simpack software hang due to network issue by replacing a new router.
- Backup the servers and send it to EGM every morning.
- Configure new windows 7 PC for HR.
- Download latest version of Finger-Tec (TCMS V2) software setup to install on windows 7.
- Download and install DBF Viewer software to open and read DBF files.
Week 7
(12th January – 16th January 2015)
- Backup the servers and send it to EGM every morning.
- Configure PC for user.
- Change a new keyboard and mouse.
- Format Windows XP to Windows 7 and configure it for a user.
- Learned how to administrate SQL Server Enterprise Manager.
- Clone a PC’s hard drive.
Week 8
(19th January – 23rd January 2015)
- Backup the servers and send it to EGM every morning.
- Troubleshoot power supply by checking the connection and AC power input.
- Replace new power supply.
- Restore Windows 7 to factory settings.
- Install RAM for PC.
- Create a batch file to delete files in a folder every 3days.
- Troubleshoot user domain login.
Week 9
(26th January – 30th January 2015)
- Backup the servers and send it to EGM every morning.
- Format Windows XP to Windows 7 and configure it for a user.
- Call windows customer service to get product key.
- Troubleshoot printer.
- Involved in Fire Extinguisher Program.
- 30th January 2015 on medical leave.
Week 10
(2nd February – 6th February 2015)
- Backup the servers and send it to EGM every morning.
- Printer troubleshoot.
- On leave for Thaipusam festival on 3rd and 4th February 2015.
- Download DLL files from internet and register them in computer system via command prompt.
- Troubleshoot LaserJet printer.
- Burn files to CD using Nero software.
FINAL REPORT 2014 - 2015